Surveillance & Re-certification Procedures Program ( Program™)
Mega Vision Certification (MVC) announces its new, exclusive Program™ for ISO 9001 & ISO 14001 certification.
The reason for developing this program is simple: to save our customers thousands of dollars annually and top manager’s valuable time.
We realize in today’s market place, the value of ISO 9001 certification varies from company to company, for some it is a requirement to do business, for the others its value has been minimized as competitors have become certified.
How Program™ Works
The MVC Program™ is based on the IAF Mandatory Document for Advanced Surveillance & Recertification Procedures Issue 1 (IAF MD3:2008). Customers will be issued certificates valid for three years based upon their existing certification and annual review by MVC of their Internal Audit & Management Review Meeting Summaries per the MVC Program™.
MVC Program™ calls for statistical sampling of all MVC Program™ certified customers and allows for MVC to visit your facility with partnership and process focus approach . These sample audits are to confirm implementation of the clients system and is not a time consuming, “non-value added” exercise. There is no cost to the MVC ™ certified customer if chosen for a sample on-site visit.
MVC is accredited by the American International Accreditation Organization, Bureau of Accredited Registrars (Accreditation Mark) an independent, not-for-profit organization with the same authority as any other accreditation body. Accreditation Mark has accredited registration in Europe, Japan, Korea, India, Pakistan, Afghanistan, Bangladesh, Central Asian Countries, Canada, England (UK), Mexico, Norway, Turkey, Abu Dhabi, Bahrain, United Arab Emirates (UAE), Saudi Arabia, Brazil, Costa Rica, Puerto Rico and the United States.
MVC Program™ is a cost effective and viable alternate to the “policeman” approach of other registrars. Feel free to contact MVC if you have any questions.
Application & Quotation
Upon receipt of appropriate information concerning company size, location, and product/service, a contract will be provided detailing certification costs.
Documentation Review
Mega Vision Certification reviews the existing quality system documentation offsite in order to establish the following:
Non-Conformance
Mega Vision Certification will issue detailed non-conformance and if necessary, request follow-up documentation to verify corrective action.
Quality System Approval Certificate
Mega Vision Certification will issue a quality system approval certificate on completion of a satisfactory documentation review and proof of implementation. The certificate is valid for three years from the date of approval, subject to satisfactory maintenance of approval.
Maintenance
Mega Vision Certification requests customers provide ongoing proof of implementation at approximately six month intervals, annually as a minimum.
Onsite Visit
Mega Vision Certification reserves the right to perform an on-site visit to confirm:
Suspension, Withdrawal, & Cancellation of Certificate
In cases where Corrective Action Requests are not satisfactorily addressed, a certificate is improperly used, failure to fulfill financial obligations to Mega Vision Certification or Mega Vision Certification’ Quality Systems Assessment Agreement is contravened, the certificate may be suspended or ultimately withdrawn. A certificate will also be withdrawn if a company does not wish to renew it, or ceases operations.
Appeals & Complaints
Client companies have the right to appeal to Mega Vision Certification’ independent Appeals Committee regarding suspension or withdrawal of certificates. A system also exists should Client companies wish to complain regarding the conduct of Mega Vision Certification’ employees or agents of the company.
Confidentiality
During the term and after termination of the agreement, Mega Vision Certification, its officers, directors, employees, and agents shall maintain the confidentiality of any information disclosed by the Client or prepared by Mega Vision Certification in connection with the performance of the services.
Third Party Inspections
Pre-Shipment Inspection (PSI)
In Agriculture, Engineering, Electrical, Surgical, Textile, Leather, Wood, Cosmetics, Herbal, Henna Powder, Pharmaceuticals, Food & Vegetables and hydroponic Products in accordance with the relevant criteria for Inspection based on AQL Sample plan.
Machinery/Equipment-Inspection
MVC also provide the inspection services for all kind of Earthmoving Construction / Industrial Machinery / Equipments In accordance with:
IEE/EIA Reports
(Initial Environmental Examination/Environmental Impact Assessment). In accordance with the requirement of (Environmental Protection Agency) PEPA Act 1997/NEQS (National Environmental Quality Standards)
Documents
Training
ISO 9001 – Quality Management System
ISO 14001 – Environmental Management System)
R2 – Responsible Recycling Practices
ISO 45001:2018 – Health & Safety Standard
ISO 16949 – Automobile Related Products
ISO 13485 – Medical Devices
ISO 17664 – Sterilisation of Medical Devices
ISO 10993 – Biological Evaluation of Medical Devices
ISO 20000 – Information Technology Service Management
ISO 27001 – Information Security Management System
ISO 26000 – Social Responsibility
BSCI – Business Social Conformance Initiative
ISO 22000 – Food Safety Management System
HACCP – Hazard Analysis Critical Control Point
Halal Food – Halal Meat-Islam Base-Slaughtering Animals
Global GAP/OC – Good Agricultural Practices)/Organic Certification
CE Mark – Product Certification
cGMP, GMP, GMP Food, GMP +B2 Production of Feed Ingredients –
Unit Certification – Entire Unit Process & Product Certification
R 2 Certification – Responsible Recycling Certification, Industry-wide standard for controlling the disposal of electronic waste in a sustainable manner. R2 certification is a voluntary set of best practices for the electronic waste industry.
AS 9100 – Aerospace Industry
ISO 17025/15189 – Testing and Calibration Laboratories-Board Accreditation-Accreditation Mark
Mega Vision Certification, ISO 9001/14001: 2015
Certification-Transfer Checklist
* MVC requires completed Internal Audit Results/Summary and Management Review Meeting Minutes to be submitted annually as a minimum to maintain certification in good standing
Mega Vision Certification, ISO 9001/14001: 2015
Maintenance of Certification Checklist
* MVC requires completed Internal Audit Results/Summary and Management Review Meeting Minutes to be submitted annually as a minimum to maintain certification in good standing
MVC Certification Mark/logo and Accreditation Mark.
1.0 PURPOSE
The purpose of this document is to define the limitations of the use of the MVC Certification Mark/Logo and the Accreditation Mark.
2.0 SCOPE
Applicable to all companies approved by MVC for EMS/QMS under the terms of accreditation granted to MVC by Applicable for all Companies certified by MVC for FSMS, EMS, OHSAS , QMS, HACCP, ISO 27001 , ISO 20000 and many more standards
3.0 Procedure for MVC and Accreditation Mark/Logo
3.1 Organizations certified by MVC for FSMS , OHSAS , EMS, QMS , HACCP and other standards under accreditation marks are entitled to use mark/logo in association with the appropriate MVC Certification mark.
3.1.1 An approved company can only use the Accreditation Mark/Logo as an integral part of MVC’s Certification Mark/Logo.
3.2 Following receipt of a MVC Approval Certificate approved companies are entitled to use the appropriate Mark/Logo under the conditions detailed below:
4.0 MISUSE
The MVC and AIOA-BAR Mark/Logos may be used on product packaging per the above guidelines, but not in a way suggesting product approval, as they apply only to Environmental/Quality Management Systems approval.
Misuse of the Marks/Logos (or Certificate) will result in the following actions:
5.0 WITHDRAWAL OF APPROVAL
In the event that approval is withdrawn, the Client shall immediately cease use and distribution of any literature, stationery, etc., bearing the Mark/Logo. Artwork supplied and copies of approval certificates are to be returned to MVC.
6.0 CONTRACTUAL OBLIGATION
Correct use of the MVC Certification and AIAO-BAR Marks/Logos (or Certificate) is a contractual obligation that the Client undertakes to comply with as per MVC’s Standard Contract.
Where the MVC Certification and AIAO-BAR Marks/Logos have been used by the Client, their use is to be reviewed at all surveillance and triennial visits to ensure that their use is correct and in accordance with procedures issued to the company. Any misuse of logos should be brought to the attention of the company and included in the remarks section of the surveillance report. (Although the approved company in some instances may have up to the date logos, they may still have stationery/brochures showing the previously issued MVC Certification and AIAO-BAR logos).
In this instance, it is permissible for the company to continue use of the previously issued logos on the understanding that the new logos must be used at the next printing.
7.0 ADDITIONAL CONTROLS
All MVC approved/certified companies may submit proofs of advertising or promotional materials which depicts the MVC Certification and AIAO-BAR logos to MVC for the following purposes:
To ensure that the correct logos are shown and are being used in accordance with this SOP.